Services
One Holistic Partner Across the Full Project Lifecycle
From early feasibility to final installation, HAS coordinates every critical stage of mass timber project delivery.
Our integrated model connects commercial analysis, structural engineering, DFMA, manufacturing, logistics and specialised installation through one accountable project structure. This continuity reduces coordination gaps, improves programme control and turns complex architectural concepts into precise, buildable mass timber structures.
Integrated Project Delivery
Six Phases. One Coordinated Process.
Each phase builds directly on the work completed before it. Project information moves from feasibility into engineering, manufacturing, logistics, installation and long-term asset support without losing technical intent or accountability.

01
Make Informed Decisions from the Start
Early decisions determine the project’s structural efficiency, programme, logistics and total cost.
HAS evaluates the architectural concept, site conditions, structural options, manufacturing strategy and construction requirements to establish whether mass timber is appropriate and how it can create the greatest project value.
Preliminary Feasibility Study
Early assessment of the architectural concept, building type, spans, loads and potential structural systems.
System Comparison
Comparison of CLT, Glulam, hybrid timber and conventional structural options according to project requirements.
Preliminary Structural Strategy
Initial definition of grids, spans, structural depth, stability systems and key interfaces.
Commercial Assessment
Preliminary evaluation of material quantities, supply approach, construction programme and cost drivers.
Programme Review
Assessment of design, manufacturing, transportation and installation timelines.
Risk Identification
Early review of authority requirements, logistics constraints, site access, moisture exposure and construction interfaces.
Deliverable: A clear preliminary basis for design, budgeting, programme development and the next stage of engineering.
Request a Feasibility Study
02
Engineer Every Element as One System
HAS develops coordinated CLT, Glulam and hybrid structural systems based on the architecture, performance requirements and construction strategy of each project.
Every panel, beam, column and connection is analysed as part of the complete building structure.
Structural Analysis
Analysis of gravity loads, lateral stability, wind, seismic conditions and applicable project actions.
CLT and Glulam Engineering
Design and verification of panels, beams, columns, arches and other mass timber elements.
Hybrid Structural Design
Integration of timber, steel and concrete where each material performs most effectively.
Connection Engineering
Design of timber-to-timber, timber-to-steel and timber-to-concrete interfaces.
Computational Design
Parametric and digital modelling for complex geometry, repeatable components and efficient coordination.
Building Physics Coordination
Integration of moisture, thermal, acoustic, vibration and envelope-performance requirements.
Fire Engineering Coordination
Structural sizing, connection protection and detailing aligned with the project’s fire strategy.
Value Engineering
Refinement of the structure for material efficiency, constructability, cost and programme.
Deliverable: A coordinated structural system developed to the level required for approval, manufacturing and construction.

03
Resolve the Construction Before It Reaches the Site
Design for Manufacture and Assembly connects engineering decisions with factory production, transport, crane operations and on-site installation.
HAS plans how every component will be manufactured, identified, packed, delivered, lifted and assembled.
Fabrication-Ready Models
Detailed digital information for panels, members, openings, interfaces and connections.
Shop and Assembly Drawings
Clear documentation for manufacturing, assembly, installation and inspection.
Component Optimisation
Standardisation and rationalisation of elements to improve production efficiency and material use.
Tolerance Coordination
Management of dimensional tolerances between timber, steel, concrete and building-envelope systems.
Installation Sequencing
Definition of the structural assembly sequence and temporary stability requirements.
Crane and Lifting Strategy
Planning of component weights, lifting points, crane locations and installation zones.
Packaging Strategy
Coordination of component identification, protection, packing and delivery sequence.
Site Construction Plan
A project-specific method covering unloading, storage, distribution, lifting, assembly and protection.
Deliverable: A coordinated plan linking the digital model, factory production, logistics and site installation.

04
Control the Material Journey from Factory to Structure
Reliable mass timber delivery requires more than placing a material order.
HAS coordinates suppliers, production schedules, quality documentation, international transportation, unloading, storage and distribution throughout the construction site.
Manufacturing Partner Coordination
Selection and coordination of suitable manufacturers based on capacity, capability, project specifications and programme.
Procurement Support
Management of technical submissions, commercial coordination and material ordering according to the agreed scope.
Production Scheduling
Alignment of manufacturing slots with design approvals, shipping and the construction programme.
Quality Documentation
Coordination of available product information, manufacturing records and project-specific documentation.
International Transportation
Planning of suitable transport routes and shipment methods from manufacturing facility to project location.
Delivery Sequencing
Materials are packed and shipped according to the planned installation sequence wherever practical.
Unloading and Handling
Methods for receiving, lifting and transferring components without unnecessary damage or rehandling.
Site Storage and Protection
Defined storage zones, weather protection and material-control procedures.
Site Distribution
Organised delivery of each package to the required construction zone at the appropriate time.
Deliverable: A coordinated logistics system designed to keep the right components moving safely from production to installation.

05
Precision Engineered. Precisely Installed.
The performance of a prefabricated structure depends on the quality and control of its assembly.
HAS develops project-specific installation methods and deploys experienced engineers, supervisors and specialised crews according to the agreed project scope.
Installation Method Statement
Detailed procedures for unloading, lifting, positioning, fixing, temporary stability and final inspection.
Specialised Site Teams
Engineers, supervisors and trained installation personnel experienced in mass timber construction.
Structural Assembly
Installation of CLT panels, Glulam members, hybrid components and engineered connections.
Temporary Stability
Planning and implementation of bracing and safe construction-stage stability.
Connection Installation
Controlled fixing, tightening and verification of structural connectors and fasteners.
Weather Protection
Construction-stage protection against rain, standing water and prolonged environmental exposure.
Airtightness and Waterproofing Interfaces
Execution or coordination of specified tapes, membranes, seals and protected junctions.
Acoustic Detailing
Coordination of specified acoustic layers and junction details within the agreed installation scope.
Quality Inspections
Planned checks of alignment, connections, protection measures and completed work.
Deliverable: A safely assembled structure installed according to approved drawings, methods and inspection requirements.

06
Protect Long-Term Structural Value
Mass timber structures are long-term assets. Their continued performance depends on correct documentation, appropriate use, moisture control and planned inspection.
HAS provides post-completion inspection and maintenance support, tailored to each project.
Handover Documentation
Compilation of relevant structural, installation and product information for the completed works.
Inspection Guidelines
Recommended inspection points, frequencies and reporting procedures.
Condition Assessments
Review of visible timber elements, connections, moisture-sensitive areas and protective systems.
Maintenance Planning
Project-specific recommendations for ongoing care and corrective action.
Repair Recommendations
Engineering guidance where localised damage, moisture exposure or connection issues are identified.
Annual Support Agreements
Scheduled inspection and technical support where included under a separate maintenance agreement.
Warranty Coordination
Clear identification of applicable supplier, product, installation and contractual warranty provisions.
Deliverable: A documented strategy to monitor condition, manage risk and support long-term structural performance.
Maintenance services and warranty coverage are subject to the final project contract, supplier terms and agreed scope of work.
One Engineering Thread
From First Decision to Final Installation
When each phase is handled separately, critical information can be lost between the consultant, manufacturer, logistics provider and installer.
HAS maintains one coordinated technical thread:
- 01
Feasibility
- 02
Structural Engineering
- 03
DFMA & Planning
- 04
Global Logistics
- 05
Installation
- 06
Inspection & Maintenance
- The feasibility study defines the structural direction.
- The structural model informs value engineering.
- The engineered system becomes fabrication information.
- The fabrication information defines packaging and logistics.
- The logistics plan follows the installation sequence.
- The installation records support inspection and maintenance.
The result is greater accountability, fewer coordination gaps and a more predictable path from design to construction.
Designed Around Project Value
What Integrated Delivery Achieves
Faster Construction
Prefabrication and planned assembly can reduce the structural construction programme.
Reduced Site Labour
Factory-prepared components can decrease dependence on large on-site workforces.
Predictable Quality
Controlled manufacturing and coordinated installation support consistent execution.
Reduced Rework
Early resolution of components, interfaces and tolerances can minimise site modifications.
Efficient Logistics
Sequenced transport and organised distribution reduce unnecessary handling and site congestion.
Earlier Operation
A shorter construction programme can allow developers to begin operating and generating returns sooner.
Material Optimisation
Timber, steel and concrete are used where they create the greatest structural and commercial value.
Clear Accountability
One coordinated delivery structure connects engineering, supply, logistics and installation.
Bring Us the Concept. We’ll Engineer the Delivery.
Share your architectural design, development plan or structural requirements with HAS. Our team will evaluate feasibility, structural strategy, manufacturing, logistics, installation and programme requirements.