HAS, Holistic Applications Solutions

Preliminary Carbon Estimate

How Much Carbon Could Your Project Store?

Explore an early estimate of the structural timber volume and biogenic carbon that could be stored within your mass timber structure.

Enter your project’s floor area for a preliminary range, or provide the timber volume directly if it is already known.

Early estimate, not a verified LCA

The calculator applies a preliminary timber-intensity range based on the selected building type and structural system. Actual timber quantities depend on grids, spans, loads, building height, structural concept, fire strategy and architectural design.

Preliminary Results

Enter your project details above and calculate to see a preliminary range.

Understanding the Estimate

What This Estimate Means

  • Timber Volume

    The approximate quantity of structural timber expected within the selected building and structural system.

  • Biogenic Carbon Stored

    An estimate of carbon absorbed during tree growth and contained within the timber product during its use in the building.

  • Range, Not a Fixed Claim

    The result is presented as a range because timber density, moisture content, product type and manufacturing information vary.

  • Time Matters

    Stored carbon remains associated with the timber during its service life. End-of-life treatment influences the longer-term carbon outcome.

These estimates depend on structural design, product mix and declarations, transport distances, installation methods and end-of-life assumptions.

Important Boundaries

What the Calculator Does Not Automatically Claim

The public calculator does not automatically calculate or combine:

  • Emissions avoided by replacing steel or concrete
  • Manufacturing emissions
  • International transportation emissions
  • Construction-stage emissions
  • Concrete and steel quantities
  • Building operational energy
  • End-of-life impacts
  • Forest-management impacts
  • Carbon credits or offsets
  • A complete project carbon footprint
  • A verified total carbon benefit

These outcomes require a defined comparison baseline, confirmed material quantities, supplier information, transport data and an agreed life-cycle assessment methodology.

From Estimate to Evidence

Compare Structural Options with Real Project Data

A project-specific assessment can compare the proposed mass timber structure with an agreed alternative system using consistent boundaries and confirmed information.

The assessment may include:

  • Verified structural material quantities
  • Manufacturer-specific EPD data
  • CLT and Glulam product mix
  • Concrete and reinforcement quantities
  • Steel connection quantities
  • Manufacturing locations
  • Transport routes and distances
  • Construction assumptions
  • Biogenic carbon reporting
  • Defined life-cycle stages
  • End-of-life scenarios
  • Comparison with an agreed baseline
Request a Project-Specific Assessment
katara

Transparent Assumptions

How the Preliminary Estimate Is Calculated

  1. 01

    Estimate Timber Volume

    When floor area is entered, the calculator applies a preliminary timber-intensity range based on the selected building type and structural system.

  2. 02

    Apply Product Information

    Where product-specific data is available, the calculation should use the relevant manufacturer information or Environmental Product Declaration.

  3. 03

    Estimate Stored Biogenic Carbon

    The calculation estimates the carbon contained within the structural timber and expresses it as carbon-dioxide equivalent.

  4. 04

    Display a Range

    A minimum and maximum estimate is shown to reflect uncertainty in timber quantities, density and product selection.

  5. 05

    Identify Confidence Level

    The result is labelled according to the quality of the information provided.

Calculation Basis and Limitations

This tool provides an early-stage screening estimate. It is intended to support initial project discussions and does not replace structural design, quantity surveying, environmental-product documentation or a formal Life Cycle Assessment.

Calculation inputs, factors, ranges, data sources, version dates and system boundaries should be published within this section and updated whenever the methodology changes.

The result must not be used to claim carbon neutrality, avoided emissions, carbon credits, regulatory compliance or third-party certification.

Prefer Technical Results Over Popular Comparisons

The primary result should remain expressed in cubic metres of timber and tonnes of CO₂ equivalent. Any optional equivalency uses a named and dated authoritative source, states the geographic context, displays the conversion factor and remains separate from the engineering result.

Equivalencies are communication aids only. They do not alter the calculated carbon result.

Need Defensible Numbers for Your Project?

Provide HAS with your drawings, preliminary quantities and project information for a more detailed structural and carbon assessment.

This calculator provides indicative estimates based on user inputs and published or project-defined assumptions.

Results may change substantially when the structural design, material quantities, manufacturer, product specification, transportation, construction method or life-cycle boundaries are confirmed.

HAS does not represent calculator outputs as a verified LCA, EPD, carbon credit, offset, certification, regulatory calculation or guaranteed environmental outcome.