One Holistic Partner Across the Full Project Lifecycle

From early feasibility to final installation, HAS coordinates every critical stage of mass timber project delivery.

Our integrated model connects commercial analysis, structural engineering, DFMA, manufacturing, logistics and specialised installation through one accountable project structure. This continuity reduces coordination gaps, improves programme control and turns complex architectural concepts into precise, buildable mass timber structures.

Integrated Project Delivery

Six Phases. One Coordinated Process.

Each phase builds directly on the work completed before it. Project information moves from feasibility into engineering, manufacturing, logistics, installation and long-term asset support without losing technical intent or accountability.

  1. 01Feasibility & Commercial Analysis
  2. 02Structural Design & Engineering
  3. 03Design for Manufacture & Assembly (DfMA)
  4. 04Supply & Global Logistics
  5. 05Specialised Installation
  6. 06Inspection & Maintenance
Engineers reviewing structural drawings inside a timber frame under construction, placeholder image

01

Make Informed Decisions from the Start

Early decisions determine the project’s structural efficiency, programme, logistics and total cost.

HAS evaluates the architectural concept, site conditions, structural options, manufacturing strategy and construction requirements to establish whether mass timber is appropriate and how it can create the greatest project value.

  • Preliminary Feasibility Study

    Early assessment of the architectural concept, building type, spans, loads and potential structural systems.

  • System Comparison

    Comparison of CLT, Glulam, hybrid timber and conventional structural options according to project requirements.

  • Preliminary Structural Strategy

    Initial definition of grids, spans, structural depth, stability systems and key interfaces.

  • Commercial Assessment

    Preliminary evaluation of material quantities, supply approach, construction programme and cost drivers.

  • Programme Review

    Assessment of design, manufacturing, transportation and installation timelines.

  • Risk Identification

    Early review of authority requirements, logistics constraints, site access, moisture exposure and construction interfaces.

Deliverable: A clear preliminary basis for design, budgeting, programme development and the next stage of engineering.

Request a Feasibility Study
Glulam colonnade and roof structure of the Fuwairit Kite Beach clubhouse

02

Engineer Every Element as One System

HAS develops coordinated CLT, Glulam and hybrid structural systems based on the architecture, performance requirements and construction strategy of each project.

Every panel, beam, column and connection is analysed as part of the complete building structure.

  • Structural Analysis

    Analysis of gravity loads, lateral stability, wind, seismic conditions and applicable project actions.

  • CLT and Glulam Engineering

    Design and verification of panels, beams, columns, arches and other mass timber elements.

  • Hybrid Structural Design

    Integration of timber, steel and concrete where each material performs most effectively.

  • Connection Engineering

    Design of timber-to-timber, timber-to-steel and timber-to-concrete interfaces.

  • Computational Design

    Parametric and digital modelling for complex geometry, repeatable components and efficient coordination.

  • Building Physics Coordination

    Integration of moisture, thermal, acoustic, vibration and envelope-performance requirements.

  • Fire Engineering Coordination

    Structural sizing, connection protection and detailing aligned with the project’s fire strategy.

  • Value Engineering

    Refinement of the structure for material efficiency, constructability, cost and programme.

Deliverable: A coordinated structural system developed to the level required for approval, manufacturing and construction.

katara

03

Resolve the Construction Before It Reaches the Site

Design for Manufacture and Assembly connects engineering decisions with factory production, transport, crane operations and on-site installation.

HAS plans how every component will be manufactured, identified, packed, delivered, lifted and assembled.

  • Fabrication-Ready Models

    Detailed digital information for panels, members, openings, interfaces and connections.

  • Shop and Assembly Drawings

    Clear documentation for manufacturing, assembly, installation and inspection.

  • Component Optimisation

    Standardisation and rationalisation of elements to improve production efficiency and material use.

  • Tolerance Coordination

    Management of dimensional tolerances between timber, steel, concrete and building-envelope systems.

  • Installation Sequencing

    Definition of the structural assembly sequence and temporary stability requirements.

  • Crane and Lifting Strategy

    Planning of component weights, lifting points, crane locations and installation zones.

  • Packaging Strategy

    Coordination of component identification, protection, packing and delivery sequence.

  • Site Construction Plan

    A project-specific method covering unloading, storage, distribution, lifting, assembly and protection.

Deliverable: A coordinated plan linking the digital model, factory production, logistics and site installation.

Mobile crane lifting a prefabricated CLT wall panel into position on the Maldives Island Resort site

04

Control the Material Journey from Factory to Structure

Reliable mass timber delivery requires more than placing a material order.

HAS coordinates suppliers, production schedules, quality documentation, international transportation, unloading, storage and distribution throughout the construction site.

  • Manufacturing Partner Coordination

    Selection and coordination of suitable manufacturers based on capacity, capability, project specifications and programme.

  • Procurement Support

    Management of technical submissions, commercial coordination and material ordering according to the agreed scope.

  • Production Scheduling

    Alignment of manufacturing slots with design approvals, shipping and the construction programme.

  • Quality Documentation

    Coordination of available product information, manufacturing records and project-specific documentation.

  • International Transportation

    Planning of suitable transport routes and shipment methods from manufacturing facility to project location.

  • Delivery Sequencing

    Materials are packed and shipped according to the planned installation sequence wherever practical.

  • Unloading and Handling

    Methods for receiving, lifting and transferring components without unnecessary damage or rehandling.

  • Site Storage and Protection

    Defined storage zones, weather protection and material-control procedures.

  • Site Distribution

    Organised delivery of each package to the required construction zone at the appropriate time.

Deliverable: A coordinated logistics system designed to keep the right components moving safely from production to installation.

katara

05

Precision Engineered. Precisely Installed.

The performance of a prefabricated structure depends on the quality and control of its assembly.

HAS develops project-specific installation methods and deploys experienced engineers, supervisors and specialised crews according to the agreed project scope.

  • Installation Method Statement

    Detailed procedures for unloading, lifting, positioning, fixing, temporary stability and final inspection.

  • Specialised Site Teams

    Engineers, supervisors and trained installation personnel experienced in mass timber construction.

  • Structural Assembly

    Installation of CLT panels, Glulam members, hybrid components and engineered connections.

  • Temporary Stability

    Planning and implementation of bracing and safe construction-stage stability.

  • Connection Installation

    Controlled fixing, tightening and verification of structural connectors and fasteners.

  • Weather Protection

    Construction-stage protection against rain, standing water and prolonged environmental exposure.

  • Airtightness and Waterproofing Interfaces

    Execution or coordination of specified tapes, membranes, seals and protected junctions.

  • Acoustic Detailing

    Coordination of specified acoustic layers and junction details within the agreed installation scope.

  • Quality Inspections

    Planned checks of alignment, connections, protection measures and completed work.

Deliverable: A safely assembled structure installed according to approved drawings, methods and inspection requirements.

katara

06

Protect Long-Term Structural Value

Mass timber structures are long-term assets. Their continued performance depends on correct documentation, appropriate use, moisture control and planned inspection.

HAS provides post-completion inspection and maintenance support, tailored to each project.

  • Handover Documentation

    Compilation of relevant structural, installation and product information for the completed works.

  • Inspection Guidelines

    Recommended inspection points, frequencies and reporting procedures.

  • Condition Assessments

    Review of visible timber elements, connections, moisture-sensitive areas and protective systems.

  • Maintenance Planning

    Project-specific recommendations for ongoing care and corrective action.

  • Repair Recommendations

    Engineering guidance where localised damage, moisture exposure or connection issues are identified.

  • Annual Support Agreements

    Scheduled inspection and technical support where included under a separate maintenance agreement.

  • Warranty Coordination

    Clear identification of applicable supplier, product, installation and contractual warranty provisions.

Deliverable: A documented strategy to monitor condition, manage risk and support long-term structural performance.

Maintenance services and warranty coverage are subject to the final project contract, supplier terms and agreed scope of work.

One Engineering Thread

From First Decision to Final Installation

When each phase is handled separately, critical information can be lost between the consultant, manufacturer, logistics provider and installer.

HAS maintains one coordinated technical thread:

  1. 01

    Feasibility

  2. 02

    Structural Engineering

  3. 03

    DFMA & Planning

  4. 04

    Global Logistics

  5. 05

    Installation

  6. 06

    Inspection & Maintenance

  • The feasibility study defines the structural direction.
  • The structural model informs value engineering.
  • The engineered system becomes fabrication information.
  • The fabrication information defines packaging and logistics.
  • The logistics plan follows the installation sequence.
  • The installation records support inspection and maintenance.

The result is greater accountability, fewer coordination gaps and a more predictable path from design to construction.

Designed Around Project Value

What Integrated Delivery Achieves

  • Faster Construction

    Prefabrication and planned assembly can reduce the structural construction programme.

  • Reduced Site Labour

    Factory-prepared components can decrease dependence on large on-site workforces.

  • Predictable Quality

    Controlled manufacturing and coordinated installation support consistent execution.

  • Reduced Rework

    Early resolution of components, interfaces and tolerances can minimise site modifications.

  • Efficient Logistics

    Sequenced transport and organised distribution reduce unnecessary handling and site congestion.

  • Earlier Operation

    A shorter construction programme can allow developers to begin operating and generating returns sooner.

  • Material Optimisation

    Timber, steel and concrete are used where they create the greatest structural and commercial value.

  • Clear Accountability

    One coordinated delivery structure connects engineering, supply, logistics and installation.

Bring Us the Concept. We’ll Engineer the Delivery.

Share your architectural design, development plan or structural requirements with HAS. Our team will evaluate feasibility, structural strategy, manufacturing, logistics, installation and programme requirements.